Click on the course title to view the course information including details on how to book.
| Course Title | Dates |
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 9/14/2010 - 9/17/2010 |
|
| Substation Maintenance I | 9/20/2010 - 9/24/2010 |
|
| Protective Device Coordination for Industry | 9/21/2010 - 9/24/2010 |
|
| Substation Maintenance II | 9/27/2010 - 10/1/2010 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 10/4/2010 - 10/8/2010 |
|
| Basic Electricity | 10/5/2010 - 10/8/2010 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 10/11/2010 - 10/12/2010 |
|
| Basic Electrical Troubleshooting | 10/11/2010 - 10/14/2010 |
|
| Protective Relay Maintenance, Solid-State | 10/11/2010 - 10/15/2010 |
|
| Substation Maintenance I | 10/11/2010 - 10/15/2010 |
|
| OSHA Electrical Safety-Related Work Practices | 10/13/2010 - 10/14/2010 |
|
| Microprocessor-Based Relay Testing, Distribution/Industrial | 10/18/2010 - 10/22/2010 |
|
| Electrical Safety for Inspectors | 10/18/2010 - 10/21/2010 |
|
| Substation Maintenance II | 10/18/2010 - 10/22/2010 |
|
| Electrical Print Reading | 10/19/2010 - 10/22/2010 |
|
| Battery Maintenance and Testing | 10/25/2010 - 10/28/2010 |
|
| Microprocessor-Based Relay Testing, Generation | 10/25/2010 - 10/29/2010 |
|
| Electrical Safety for Industrial Facilities | 10/25/2010 - 10/28/2010 |
|
| Motor Maintenance and Testing | 10/26/2010 - 10/29/2010 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 10/26/2010 - 10/29/2010 |
|
| Advanced Visual Testing Software | 11/1/2010 - 11/5/2010 |
|
| Motor Controls and Starters (Low-Voltage) | 11/1/2010 - 11/5/2010 |
|
| Substation Maintenance I | 11/1/2010 - 11/5/2010 |
|
| National Electrical Code® | 11/2/2010 - 11/5/2010 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 11/2/2010 - 11/5/2010 |
|
| Cable Testing and Fault Location | 11/8/2010 - 11/11/2010 |
|
| Substation Maintenance II | 11/8/2010 - 11/12/2010 |
|
| Protective Relay Maintenance, Basic | 11/8/2010 - 11/12/2010 |
|
| Power Quality and Harmonics | 11/9/2010 - 11/12/2010 |
|
| Advanced Visual Testing Software, One Touch | 11/9/2010 - 11/11/2010 |
|
| Electrical Safety for Industrial Facilities | 11/15/2010 - 11/18/2010 |
|
| Protective Relay Maintenance, Advanced | 11/15/2010 - 11/19/2010 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 11/15/2010 - 11/19/2010 |
|
| Short Circuit Analysis | 11/15/2010 - 11/18/2010 |
|
| Transformer Testing and Maintenance | 11/16/2010 - 11/19/2010 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 11/22/2010 - 11/23/2010 |
|
| Protective Relay Maintenance, Basic | 11/29/2010 - 12/3/2010 |
|
| Substation Maintenance I | 11/29/2010 - 12/3/2010 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 11/30/2010 - 12/3/2010 |
|
| Electrical Safety for Utilities | 11/30/2010 - 12/3/2010 |
|
| Cable Testing and Fault Location | 12/6/2010 - 12/9/2010 |
|
| Electrical Safety for Inspectors | 12/6/2010 - 12/9/2010 |
|
| Protective Relay Maintenance, Advanced | 12/6/2010 - 12/10/2010 |
|
| Substation Maintenance II | 12/6/2010 - 12/10/2010 |
|
| Basic Electricity | 12/7/2010 - 12/10/2010 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 12/13/2010 - 12/16/2010 |
|
| Electrical Safety for Industrial Facilities | 12/13/2010 - 12/16/2010 |
|
| Grounding and Bonding | 12/13/2010 - 12/16/2010 |
|
| Microprocessor-Based Relay Testing, Generation | 12/13/2010 - 12/17/2010 |
|
| Basic Electrical Troubleshooting | 12/13/2010 - 12/16/2010 |
|
| Battery Maintenance and Testing | 12/13/2010 - 12/16/2010 |
|
| NFPA 70E Electrical Safety Requirements | 12/14/2010 - 12/15/2010 |
|
| Arc Flash Compliance | 12/15/2010 - 12/16/2010 |
|
| Power Factor Testing | 12/15/2010 - 12/17/2010 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 1/3/2011 - 1/7/2011 |
|
| Protective Relay Maintenance, Generation | 1/3/2011 - 1/7/2011 |
|
| NFPA 70E Electrical Safety Requirements | 1/4/2011 - 1/5/2011 |
|
| Electrical Safety for Inspectors | 1/4/2011 - 4/7/2011 |
|
| Basic Electricity | 1/4/2011 - 1/7/2011 |
|
| Arc Flash Compliance | 1/6/2011 - 1/7/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 1/10/2011 - 1/11/2011 |
|
| Electrical Safety for Industrial Facilities | 1/10/2011 - 1/13/2011 |
|
| Basic Electrical Troubleshooting | 1/10/2011 - 1/13/2011 |
|
| Motor Maintenance and Testing | 1/11/2011 - 1/14/2011 |
|
| OSHA Electrical Safety-Related Work Practices | 1/12/2011 - 1/13/2011 |
|
| Substation Maintenance I | 1/17/2011 - 1/21/2011 |
|
| Short Circuit Analysis | 1/17/2011 - 1/20/2011 |
|
| Motor Controls and Starters (Low-Voltage) | 1/17/2011 - 1/21/2011 |
|
| Electrical Print Reading | 1/17/2011 - 1/20/2011 |
|
| Battery Maintenance and Testing | 1/24/2011 - 1/27/2011 |
|
| National Electrical Code® | 1/24/2011 - 1/27/2011 |
|
| Substation Maintenance II | 1/24/2011 - 1/28/2011 |
|
| Differential Relay Systems | 1/24/2011 - 1/26/2011 |
|
| Electrical Safety for Utilities | 1/31/2011 - 2/3/2011 |
|
| Advanced Visual Testing Software | 1/31/2011 - 2/4/2011 |
|
| Protective Device Coordination for Industry | 2/1/2011 - 2/3/2011 |
|
| Protective Device Coordination for Utilities | 2/7/2011 - 2/9/2011 |
|
| Advanced Visual Testing Software, One Touch | 2/8/2011 - 2/10/2011 |
|
| Power Quality and Harmonics | 2/14/2011 - 2/17/2011 |
|
| Microprocessor-Based Relay Testing, Distribution/Industrial | 2/14/2011 - 2/18/2011 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 2/14/2011 - 2/17/2011 |
|
| Microprocessor-Based Relay Testing, Generation | 2/21/2011 - 2/25/2011 |
|
| NFPA 70E Electrical Safety Requirements | 2/21/2011 - 2/22/2011 |
|
| Protective Relay Maintenance, Basic | 2/21/2011 - 2/25/2011 |
|
| Transformer Testing and Maintenance | 2/21/2011 - 2/24/2011 |
|
| Arc Flash Compliance | 2/23/2011 - 2/24/2011 |
|
| Grounding and Bonding | 2/28/2011 - 3/3/2011 |
|
| Protective Relay Maintenance, Advanced | 2/28/2011 - 3/4/2011 |
|
| Protective Relay Maintenance, Solid-State | 3/7/2011 - 3/11/2011 |
|
| Power Factor Testing | 3/7/2011 - 3/9/2011 |
|
| Basic Electricity | 3/8/2011 - 3/11/2011 |
|
| Substation Maintenance I | 3/14/2011 - 3/18/2011 |
|
| Basic Electrical Troubleshooting | 3/14/2011 - 3/17/2011 |
|
| Protective Relay Maintenance, Generation | 3/14/2011 - 3/18/2011 |
|
| Distribution Transformer Maintenance and Testing | 3/14/2011 - 3/16/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 3/15/2011 - 3/18/2011 |
|
| Battery Maintenance and Testing | 3/21/2011 - 3/24/2011 |
|
| Cable Testing and Fault Location | 3/21/2011 - 3/24/2011 |
|
| Substation Maintenance II | 3/21/2011 - 3/25/2011 |
|
| Differential Relay Systems | 3/28/2011 - 3/30/2011 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 3/28/2011 - 4/1/2011 |
|
| Electrical Safety for Industrial Facilities | 3/28/2011 - 3/31/2011 |
|
| Microprocessor-Based Relay Testing, Generation | 4/4/2011 - 4/8/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 4/4/2011 - 4/5/2011 |
|
| OSHA Electrical Safety-Related Work Practices | 4/6/2011 - 4/7/2011 |
|
| Electrical Safety for Utilities | 4/11/2011 - 4/14/2011 |
|
| Power Quality and Harmonics | 4/11/2011 - 4/14/2011 |
|
| Protective Device Coordination for Industry | 4/12/2011 - 4/14/2011 |
|
| Protective Device Coordination for Utilities | 4/18/2011 - 4/20/2011 |
|
| Protective Relay Maintenance, Basic | 5/2/2011 - 5/6/2011 |
|
| Motor Maintenance and Testing | 5/3/2011 - 5/6/2011 |
|
| National Electrical Code® | 5/3/2011 - 5/6/2011 |
|
| Motor Controls and Starters (Low-Voltage) | 5/9/2011 - 5/13/2011 |
|
| Protective Relay Maintenance, Advanced | 5/9/2011 - 5/13/2011 |
|
| Power Factor Testing | 5/9/2011 - 5/11/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 5/10/2011 - 5/13/2011 |
|
| Cable Testing and Fault Location | 5/16/2011 - 5/19/2011 |
|
| Substation Maintenance I | 5/16/2011 - 5/20/2011 |
|
| Battery Maintenance and Testing | 5/16/2011 - 5/19/2011 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 5/16/2011 - 5/19/2011 |
|
| Electrical Print Reading | 5/16/2011 - 5/19/2011 |
|
| Short Circuit Analysis | 5/23/2011 - 5/26/2011 |
|
| Electrical Safety for Industrial Facilities | 5/23/2011 - 5/26/2011 |
|
| Transformer Testing and Maintenance | 5/23/2011 - 5/26/2011 |
|
| Substation Maintenance II | 5/23/2011 - 5/27/2011 |
|
| NFPA 70E Electrical Safety Requirements | 5/24/2011 - 5/25/2011 |
|
| Arc Flash Compliance | 5/26/2011 - 5/27/2011 |
|
| Distribution Transformer Maintenance and Testing | 6/1/2011 - 6/3/2011 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 6/6/2011 - 6/10/2011 |
|
| Grounding and Bonding | 6/6/2011 - 6/9/2011 |
|
| Differential Relay Systems | 6/6/2011 - 6/8/2011 |
|
| Basic Electricity | 6/7/2011 - 6/10/2011 |
|
| Microprocessor-Based Relay Testing, Distribution/Industrial | 6/13/2011 - 6/17/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 6/13/2011 - 6/14/2011 |
|
| Basic Electrical Troubleshooting | 6/13/2011 - 6/16/2011 |
|
| OSHA Electrical Safety-Related Work Practices | 6/15/2011 - 6/16/2011 |
|
| Substation Maintenance I | 6/20/2011 - 6/24/2011 |
|
| Advanced Visual Testing Software | 6/20/2011 - 6/24/2011 |
|
| NFPA 70E Electrical Safety Requirements | 6/21/2011 - 6/22/2011 |
|
| Arc Flash Compliance | 6/23/2011 - 6/24/2011 |
|
| Substation Maintenance II | 6/27/2011 - 7/1/2011 |
|
| Electrical Safety for Inspectors | 6/27/2011 - 6/30/2011 |
|
| Advanced Visual Testing Software, One Touch | 6/28/2011 - 6/30/2011 |
|
| Differential Relay Systems | 7/6/2011 - 7/8/2011 |
|
| Power Factor Testing | 7/6/2011 - 7/8/2011 |
|
| Protective Relay Maintenance, Basic | 7/11/2011 - 7/15/2011 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 7/11/2011 - 7/14/2011 |
|
| Electrical Safety for Utilities | 7/11/2011 - 7/14/2011 |
|
| Power Quality and Harmonics | 7/11/2011 - 7/14/2011 |
|
| Motor Maintenance and Testing | 7/12/2011 - 7/15/2011 |
|
| Protective Relay Maintenance, Advanced | 7/18/2011 - 7/22/2011 |
|
| Motor Controls and Starters (Low-Voltage) | 7/18/2011 - 7/22/2011 |
|
| Substation Maintenance I | 7/18/2011 - 7/22/2011 |
|
| Electrical Print Reading | 7/18/2011 - 7/21/2011 |
|
| Distribution Transformer Maintenance and Testing | 7/25/2011 - 7/27/2011 |
|
| Protective Relay Maintenance, Solid-State | 7/25/2011 - 7/29/2011 |
|
| Substation Maintenance II | 7/25/2011 - 7/29/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 7/26/2011 - 7/29/2011 |
|
| Transformer Testing and Maintenance | 8/1/2011 - 8/4/2011 |
|
| Electrical Safety for Industrial Facilities | 8/1/2011 - 8/4/2011 |
|
| Protective Relay Maintenance, Solid-State | 8/8/2011 - 8/12/2011 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 8/8/2011 - 8/12/2011 |
|
| Battery Maintenance and Testing | 8/8/2011 - 8/11/2011 |
|
| Electrical Safety for Utilities | 8/8/2011 - 8/11/2011 |
|
| Short Circuit Analysis | 8/8/2011 - 8/11/2011 |
|
| Protective Device Coordination for Utilities | 8/15/2011 - 8/17/2011 |
|
| Grounding and Bonding | 8/15/2011 - 8/18/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 8/15/2011 - 8/16/2011 |
|
| Advanced Visual Testing Software | 8/15/2011 - 8/19/2011 |
|
| NFPA 70E Electrical Safety Requirements | 8/17/2011 - 8/18/2011 |
|
| OSHA Electrical Safety-Related Work Practices | 8/17/2011 - 8/18/2011 |
|
| Substation Maintenance I | 8/22/2011 - 8/26/2011 |
|
| Advanced Visual Testing Software, One Touch | 8/23/2011 - 8/25/2011 |
|
| Protective Device Coordination for Industry | 8/23/2011 - 8/25/2011 |
|
| Substation Maintenance II | 8/29/2011 - 9/2/2011 |
|
| Protective Relay Maintenance, Generation | 8/29/2011 - 9/2/2011 |
|
| Differential Relay Systems | 9/7/2011 - 9/9/2011 |
|
| Power Factor Testing | 9/7/2011 - 9/9/2011 |
|
| Electrical Safety for Industrial Facilities | 9/12/2011 - 9/15/2011 |
|
| National Electrical Code® | 9/12/2011 - 9/15/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 9/13/2011 - 9/16/2011 |
|
| Electrical Safety for Inspectors | 9/19/2011 - 9/22/2011 |
|
| Cable Testing and Fault Location | 9/19/2011 - 9/22/2011 |
|
| Microprocessor-Based Relay Testing, Distribution/Industrial | 9/19/2011 - 9/23/2011 |
|
| Electrical Safety for Utilities | 9/26/2011 - 9/29/2011 |
|
| Substation Maintenance I | 9/26/2011 - 9/30/2011 |
|
| Protective Relay Maintenance, Basic | 9/26/2011 - 9/30/2011 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 9/26/2011 - 9/30/2011 |
|
| Substation Maintenance II | 10/3/2011 - 10/7/2011 |
|
| Protective Relay Maintenance, Advanced | 10/3/2011 - 10/7/2011 |
|
| Distribution Transformer Maintenance and Testing | 10/3/2011 - 10/5/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 10/3/2011 - 10/4/2011 |
|
| Short Circuit Analysis | 10/3/2011 - 10/6/2011 |
|
| NFPA 70E Electrical Safety Requirements | 10/5/2011 - 10/6/2011 |
|
| Protective Device Coordination for Utilities | 10/10/2011 - 10/12/2011 |
|
| Protective Relay Maintenance, Solid-State | 10/10/2011 - 10/15/2011 |
|
| Electrical Safety for Utilities | 10/10/2011 - 10/13/2011 |
|
| Grounding and Bonding | 10/10/2011 - 10/13/2011 |
|
| Basic Electricity | 10/11/2011 - 10/14/2011 |
|
| Protective Relay Maintenance, Generation | 10/17/2011 - 10/21/2011 |
|
| Microprocessor-Based Relay Testing, Generation | 10/17/2011 - 10/21/2011 |
|
| Basic Electrical Troubleshooting | 10/17/2011 - 10/20/2011 |
|
| OSHA Electrical Safety-Related Work Practices | 10/17/2011 - 10/18/2011 |
|
| Electrical Print Reading | 10/17/2011 - 10/20/2011 |
|
| Battery Maintenance and Testing | 10/24/2011 - 10/27/2011 |
|
| Electrical Safety for Industrial Facilities | 10/24/2011 - 10/27/2011 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 10/24/2011 - 10/27/2011 |
|
| Motor Maintenance and Testing | 10/25/2011 - 10/28/2011 |
|
| Advanced Visual Testing Software | 10/31/2011 - 11/4/2011 |
|
| Substation Maintenance I | 10/31/2011 - 11/4/2011 |
|
| Motor Controls and Starters (Low-Voltage) | 10/31/2011 - 11/4/2011 |
|
| National Electrical Code® | 11/1/2011 - 11/4/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 11/1/2011 - 11/4/2011 |
|
| Electrical Safety for Inspectors | 11/1/2011 - 11/4/2011 |
|
| Cable Testing and Fault Location | 11/7/2011 - 11/10/2011 |
|
| Substation Maintenance II | 11/7/2011 - 11/11/2011 |
|
| Protective Relay Maintenance, Basic | 11/7/2011 - 11/11/2011 |
|
| Circuit Breaker Maintenance, Low-Voltage (1000V or Less) | 11/7/2011 - 11/11/2011 |
|
| Advanced Visual Testing Software, One Touch | 11/8/2011 - 11/10/2011 |
|
| Power Quality and Harmonics | 11/14/2011 - 11/17/2011 |
|
| Protective Relay Maintenance, Advanced | 11/14/2011 - 11/18/2011 |
|
| Electrical Safety for Industrial Facilities | 11/14/2011 - 11/17/2011 |
|
| Circuit Breaker Maintenance, Molded- and Insulated-Case | 11/14/2011 - 11/15/2011 |
|
| Protective Device Coordination for Industry | 11/15/2011 - 11/17/2011 |
|
| Transformer Testing and Maintenance | 11/28/2011 - 12/1/2011 |
|
| Microprocessor-Based Relay Testing, Distribution/Industrial | 11/28/2011 - 12/2/2011 |
|
| Substation Maintenance I | 11/28/2011 - 12/2/2011 |
|
| Cable Splicing and Terminating of Medium-Voltage Cables | 11/29/2011 - 12/2/2011 |
|
| Distribution Transformer Maintenance and Testing | 11/29/2011 - 12/1/2011 |
|
| Cable Testing and Fault Location | 12/5/2011 - 12/8/2011 |
|
| Microprocessor-Based Relay Testing, Generation | 12/5/2011 - 12/9/2011 |
|
| Substation Maintenance II | 12/5/2011 - 12/9/2011 |
|
| Basic Electricity | 12/6/2011 - 12/9/2011 |
|
| Circuit Breaker Maintenance, Medium-Voltage (Air and Vacuum) | 12/12/2011 - 12/15/2011 |
|
| Electrical Safety for Utilities | 12/12/2011 - 12/15/2011 |
|
| Electrical Safety for Industrial Facilities | 12/12/2011 - 12/15/2011 |
|
| Basic Electrical Troubleshooting | 12/12/2011 - 12/15/2011 |
|
| Protective Relay Maintenance, Solid-State | 12/12/2011 - 12/16/2011 |
|